Ordering a dumpster that's too small means a second rental. Ordering one that's too big means paying for space you don't use. You don't need to be a contractor to get it right. You just need a notepad, a few minutes and a unit everybody understands: the pickup truck load.
Here's a simple, four-step way to estimate your project and match it to the right bin.
Step 1: Learn the Pickup Truck Rule
Most people can't picture a cubic yard. Almost everyone can picture the bed of a pickup truck heaped level with junk. That's roughly 2.5 cubic yards of loose debris.
So:
| Bin Size | Dimensions | About |
|---|---|---|
| 4 yard | 10' × 5.5' × 2' | 1.5 pickup loads |
| 6 yard | 10' × 5.5' × 3' | 2 to 3 pickup loads |
| 10 yard | 10' × 7' × 4' | 4 pickup loads |
| 15 yard | 11' × 8' × 4.5' | 5 to 6 pickup loads |
| 20 yard | 11' × 8' × 6' | 8 pickup loads |
Sizes vary by location. Some locations offer a 14 yard instead of a 15 (same 11' × 8' × 4.5' bin), and Canadian locations offer 9 and 12 yard sizes too.
Step 2: Estimate Your Project in Pickup Loads
Use the closest match below as a starting point. These are rough rules of thumb, not guarantees. Every house is different.
Cleanouts
| Project | Rough Estimate |
|---|---|
| One bedroom or spare room | 1 to 2 pickup loads |
| One-car garage | 2 to 3 pickup loads |
| Two-car garage, typical | 3 to 4 pickup loads |
| Two-car garage, packed | 5 to 6 pickup loads |
| Basement | 3 to 6 pickup loads |
| Attic | 2 to 4 pickup loads |
| Whole house, moving or estate cleanout | 6 to 8+ pickup loads |
Remodels
| Project | Rough Estimate |
|---|---|
| Bathroom (vanity, toilet, tile, drywall) | 1 to 2 pickup loads, but heavy |
| Kitchen, cabinets and counters only | 2 to 3 pickup loads |
| Full kitchen, including drywall and flooring | 4 to 6 pickup loads |
| Carpet and padding, about 1,000 sq ft | 2 to 4 pickup loads |
| Small deck tear-off | 3 to 5 pickup loads |
Yard and Outdoor Projects
| Project | Rough Estimate |
|---|---|
| Shed cleanout | 1 to 3 pickup loads |
| Shrub and brush removal | 2 to 4 pickup loads |
| Storm debris, a few large limbs | 3 to 6 pickup loads |
| Old wooden shed demolition | 4 to 6 pickup loads |
Calculator Tip: Add up every room or area in your project, then add 20%. Debris always takes more space than you expect, because nothing packs perfectly. A broken chair or a pile of drywall has a lot of air in it.
Step 3: Adjust for Weight
This is the step most people skip, and it's the one that causes extra fees.
Every bin has a weight allowance. Some materials hit that limit long before the bin looks full:
- Concrete, brick and pavers
- Dirt, sod and gravel
- Tile and mortar
- Roofing shingles
- Plaster and lath
If your debris is mostly heavy, size down. A 4, 6 or 10 yard bin filled with heavy material is often the right answer, even if you have more volume than it seems to hold. You may need two loads instead of one bigger bin.
If your debris is mostly light and bulky, like furniture, boxes, carpet, cabinets or yard waste, you can size by volume with confidence.
Not sure how heavy roofing gets? See how much roofing shingles weigh.
Step 4: Check Your Space
The right size also has to fit where you'll put it. Measure:
- Length and width of the spot, plus room in front for the delivery truck
- Overhead clearance from trees, wires and gutters
- The path in from the street
Bin There Dump That bins are about the size of a minivan. The 15 and 20 yard bins share the same footprint (the 20 is just taller), so if your driveway fits one, it fits the other.
Worked Example: A Two-Car Garage and an Attic
Here's how it adds up for a typical weekend cleanout:
- Two-car garage, fairly full: 4 pickup loads
- Attic with boxes and old furniture: 2 pickup loads
- Subtotal: 6 pickup loads
- Add 20%: about 7 pickup loads
- Weight check: mostly light, bulky items, so no adjustment
If the same homeowner were clearing a patio of broken concrete instead, they'd likely choose a smaller bin, or two, because of weight.
When You're Between Two Sizes
- Go up a size if your debris is light and you might find more as you go. The price difference between sizes is usually small compared with a second rental.
- Stay smaller if your debris is heavy, your driveway is tight, or you're confident in your estimate.
- Ask the local team. They see these projects every day and can tell you what's worked for jobs like yours.
More Help Choosing
- What size dumpster do I need? Our main size guide
- How big is a 10 yard dumpster?
- How big is a 15 yard dumpster?
- How much does it cost to rent a dumpster?
Ready to Order?
Once you have your estimate, find your nearest Bin There Dump That location or request a bin online. Share your pickup-load estimate and what you're throwing away, and the team will confirm the right size.
FAQs
What's the best way to figure out what size dumpster I need?
The best way to figure out what size dumpster you need is to estimate your debris in pickup truck loads, add 20%, and match that to a bin: a 10 yard holds about four loads and a 20 yard about eight. Then adjust down if your debris is heavy, like concrete, tile or shingles.
How many pickup truck loads are in a dumpster?
A 10 yard dumpster holds about four pickup truck loads of loose debris, a 15 yard about five to six, and a 20 yard about eight. One pickup load is roughly 2.5 cubic yards of debris heaped level with the top of the bed.
Is it better to order a bigger dumpster just in case?
For light, bulky debris, going one size up is often smart, since the price difference is usually small compared with a second rental. For heavy debris, a bigger bin can reach its weight allowance before it's full, so a smaller bin or two loads is often the better choice.